GreenSPring Evaluation

GreenSPring Synthesis

Whilst we hope the full report will be of interest, a shorter synthesis of the work of the pilot has also been produced and is available here in two formats.

GreenSPring synthesis

GreenSPring synthesis unformatted version

GreenSPring Evaluation Report

This document is the overall report for the Derby and Derbyshire Green Social Prescribing pilot, which ran between January 2021 and March 2023. Appendix 4 is available here as a separate document (other appendices are part of the main report).

GreenSPring Evaluation Report

Appendix 4

National Green Social Prescribing Test and Learn Pilot Reports

GreenSPring (the Derby and Derbyshire site) was part of a £5.77 million cross government Green Social Prescribing Programme, which ran for two years from April 2021. The interim and full evaluation reports are now available.

Interim National GSP Report (January 2023)

Final National GSP Report (2024) (available March 2024)